The White River Floodplain Restoration project restored nearly 250 acres of floodplain, making it one of the largest floodplain restoration projects in Washington state. The surrounding area, which includes Pierce County’s largest distribution center, has experienced significant and widespread flooding.
The project reduces flood risk and restores habitat while improving conditions for the surrounding community and economic center.
Approximately 1 million cubic yards of embankment were excavated. Side channels, box culverts, dolos, and engineered log structures were installed, along with 150 acres of plantings to provide critical habitat. The project also included retrofitting an existing pedestrian bridge over the White River and rerouting the Sumner Link Trail.
Parametrix provided project management, constructability review, construction management, fish exclusion, documentation, and inspection services. Project partners include Muckleshoot Indian Tribe, Natural Systems Design, Pierce County, and Puyallup Tribe of Indians.