news
Parametrix to Complete Final Design of New Silverdale Transit Center
10.08.19
Rendering courtesy of Schemata Workshop
Bremerton, WA – Kitsap Transit has awarded Parametrix the contract to complete final design of the new Silverdale Transit Center. This is a continuation of the preliminary engineering work the firm has completed.
The current transit center is located near the interchange of SR 3 and SR 303. The new location will be just southwest of the SR 303 interchange and Ridgetop Boulevard NW across from the Harrison Medical Center. This location will be closer to housing and employment centers than the current location. Kitsap Transit has been working with CHI Hospital, as they are conducting improvements in the area for an expansion. The team is also coordinating with Kitsap County, WSDOT, Harrison Hospital, and the Federal Transit Administration.
Rendering courtesy of Schemata Workshop
Parametrix prepared an operational, environmental, and cost assessment to identify a preferred alternative layout. A traffic analysis was also conducted. Construction is set to begin in late 2020 and last through 2021.
About Parametrix
Parametrix is a 100-percent employee-owned firm celebrating 50 years in business. We are comprised of 500 employee-owners providing inspired solutions in engineering, planning, and environmental sciences. We serve our clients from locations in Washington, Oregon, Idaho, Utah, New Mexico, and Nevada. Parametrix has been named one of Washington and Oregon’s 100 Best Companies to Work for. Connect with Parametrix: find us on Facebook, LinkedIn, Twitter, and Instagram @parametrix_inc.
Inspired People, Inspired Solutions, Making a Difference.