SR 520 Bridge Replacement and HOV Program

The $5-billion SR 520 Bridge Replacement and HOV Program completely rebuilds, expands, and modernizes the SR 520 freeway and bridges from I-405 across Lake Washington to I-5 and South Lake Union, while maintaining service on the existing facility.

Major phases and projects include:

  • Full program preliminary engineering and NEPA/SEPA environmental approval
  • Program strategic planning (defining phasing, funding, and implementation)
  • SR 520 Eastside Transit and HOV Design-Build Project
  • SR 520 Montlake Interchange to Lake Washington Design-Build Project
  • SR 520 Floating Bridge and Landings Project
  • West Connection Bridge and West Approach Bridge North
  • Portage Bay and 2nd Montlake Bascule Bridges, I-5 and Montlake interchanges, and the North Capitol Hill and Montlake Lids
  • Bridge and Pontoon Casting Yard, Grays Harbor County

For nearly two decades, Parametrix has been a leading partner on the WSDOT GEC team, helping to manage and deliver this 13-mile multi-jurisdictional program from design and environmental clearance, siting and determination of alignments, engineering design, implementation and phasing, through APD and construction. Parametrix has provided many project roles:

  • Program management and administrative support
  • Engineering
  • Landscape architecture and urban design
  • Traffic engineering
  • Transportation planning
  • Stormwater management
  • Structural engineering
  • Environmental planning
  • Design-build project procurement and oversight
  • Construction management