Lightbox
Lightbox is an advanced two-story manufacturing facility producing commercial gem-quality diamonds up to one carat in size.
Lightbox is an advanced two-story manufacturing facility producing commercial gem-quality diamonds up to one carat in size.
The 16-mile multi-use Lake to Sound Trail is being built in segments and will ultimately span from the south end of Lake Washington to the shoreline of Puget Sound.
Lake to Sound Trail Read More »
The East Lake Sammamish Trail (ELST) is part of the Locks to Lakes Corridor, a 44-mile-long regional trail corridor that connects Seattle to the Eastside and the Cascade Foothills.
East Lake Sammamish Trail Read More »
Seattle City Light owns and operates a hydroelectric facility, Boundary Dam, located on the Pend Oreille River to supply power to its customers.
Boundary Dam Bi-Annual Collimation Deflection Surveys Read More »
This project includes reconstruction of Atrisco Vista Boulevard from Double Eagle II Road to Paseo del Norte. The roadway reconstruction will include bike lane, pedestrian facility, lighting, signage, ITS, and drainage improvements.
Atrisco Vista Boulevard Read More »
In 2012, 785+ acres of former Olympic National Park lands were ceded back to the Tribe. The overall project is known as the Move to Higher Ground (MTHG).
Move to Higher Ground Read More »
Yelm’s 1.0 mgd water reclamation facility needed upgrades to produce an adequate supply of Class A reclaimed water and to meet expected population growth.
Yelm Water Reclamation Facility Read More »
The Northwest Seaport Alliance currently leases out approximately 140 acres for container handling operations at the West Sitcum Terminal.
West Sitcum Stormwater Treatment Read More »
The Budd Inlet Treatment Plant uses both physical and biological processes to clean wastewater as it moves through the system.
Budd Inlet Treatment Plant UV Disinfection Upgrade Read More »
The Tulalip Water Pipeline is a partnership between the Tulalip Tribes and the City of Everett.
Tulalip Water Pipeline Read More »